There are installations, there is no money: why Ukrainian cities may remain without light and heat in winter.
29.11.2024
1186

Journalist
Shostal Oleksandr
29.11.2024
1186

Ukraine is facing problems with the installation of gas piston units (GPU) that are supposed to provide backup power supply during outages. According to an expert, only 35 out of 91 GPUs have been installed so far. Many cities do not have the funds to connect this equipment. Even regional centers are facing this issue, as some are not receiving GPUs from the authorities. However, Khmelnytsky managed to solve this problem back in 2009 and successfully uses GPUs during power outages. The expert urges local authorities to allocate funds for communal needs, which will ensure the proper functioning of critical infrastructure even during outages.
Read also
- Poland offered Ukraine an alternative for sending its troops
- Trump's Peace Efforts: Yermak Made an Important Statement in London
- Black route of occupation: which vessels transport Ukrainian coal from Mariupol to Russia
- Ceasefire: Zelensky stated that Ukraine is ready to immediately stop the fire
- A swarm of drones attacked a factory producing 'Shaheds' in Russia
- Energy Assistance: Donors Contributed 1.2 Billion Euros to Restore Ukrainian Infrastructure